Home > Prevailing Wage

 · Wage Schedule
 · Submit Notice Of Award  · Submit Notice Of Project Completion
:  2021011732
:  Town
:  Accepted Article 8

Contracting Agency
Send Reply To

Town of Fenton
Randy Ritter
Highway Superintendent
16 Palmer Hill Road
Port Crane NY 13833

(607) 648-5080
hwysupv@townoffenton.com

John Mastronardi
Senior Project Engineer
Griffiths Engineering, LLC
13 S. Washington Street
Binghamton NY 13903

(607) 724 -2400 Ext: 223
(607) 724-2436 Fax
jmastronardi@griffithsengineering.com
Project Information
  Path of Life Rd. Culvert Repl.
  Replacement of a damaged steel culvert with an aluminum box culvert.
  2016-127-029
  PathofLife Rd. & Ballyhack Rd.
  Path of Life Road
  Port Crane
  Fenton
/   NY 13833
  Heavy and Highway Construction (New and Repair)
  12/15/2021
  Construction (Building, Heavy & Highway, Sewer, Water, Tunnel)
Broome